The Shanghai epidemic added “322+19,660” new cases on April 6, and the cumulative number of locally infected people has exceeded 100,000 people.
In order to curb the epidemic as soon as possible, the People's Daily reported that the renovation of the National Convention and Exhibition Center (Shanghai) Hub Hospital is in full swing. The giant “square cabin”, with more than 40,000 beds, will be opened in two days. Medical personnel from all over the country are already on standby to enter and treat patients as soon as conditions are favorable.
Converting a convention center into a square-cabin hospital is a huge and complex project, and the internal sterilization and decontamination and purification is much more difficult than that of a normal square-cabin hospital.
The air sterilizer project was undertaken by a well-known air sterilizer manufacturer in China. When learning that the next batch of orders would be used in the Shanghai Square Cabin Hospital, Pansystems immediately raised its order to the highest priority to ensure that Pansystems' thoughts would be delivered to the Shanghai Square Cabin Hospital at the first time to complete the glorious mission of epidemic prevention.
I hope the epidemic in Shanghai dissipates soon and the Pearl of the Orient regains its former glory.
The air sterilizers installed in this project were equipped with Pan-Shida AC dual inlet centrifugal fans. Using simulation and ternary flow technologies, Pan-Shida has developed fans with higher efficiency and lower noise. This enables Pansystem's fans to perform well in the face of higher demands from customers and to be recognized by them.